Hydropower Generating Unit
HEC’s hydropower products mainly include: Francis, Kaplan, Bulb, Pumped storage, Pelton and other types, with cooling methods covering full air-cooled, water-cooled, evaporative cooling, etc. The product design and manufacturing technologies have reached the international leading level. The diameter of Francis runner reaches 10.44m, the maximum single unit capacity is 1000 MW, and it can realize the safe and stable operation of 0-100% full load; the diameter of Kaplan runner reaches 10.4m, the maximum single unit capacity is 230 MW. The large hydropower generating units produced by HEC account for 1/2 of the total installed capacity in China, and the hydropower products put into operation are installed in more than 300 power stations with a total installed capacity of more than 100,000MW.
-
No.6 Unit of Xiluodu Hydropower Station
No.6 Unit of Xiluodu Hydropower Station
-
The bulb units in the Vietnamese Fuxin II hydropower station
The bulb units in the Vietnamese Fuxin II hydropower station
-
The world's first 1000MW francis unit for Baihetan hydropower station
The world's first 1000MW francis unit for Baihetan hydropower station
-
Whole-forged Pelton Runner for Minas HPP in Ecuador
Whole-forged Pelton Runner for Minas HPP in Ecuador
-
400MW pumped storage units in Yangjiang power station
400MW pumped storage units in Yangjiang power station
-
Spherical Valve of Pump-Storage unit for Xianju HPP
Spherical Valve of Pump-Storage unit for Xianju HPP
-
200MW kaplan units in Datengxia hydropower station
200MW kaplan units in Datengxia hydropower station
-
Runner for Jurala Project , India
Runner for Jurala Project , India